Preparing for a Passive Fire Protection Inspection: A Contractor’s Pre-Visit Checklist
Half the time lost on an inspection day is spent looking for drawings, keys and the person who knows which…
Home ›
Insights
Technical articles on firestop, fireproofing, FM200 integrity, coating thickness, air and duct leakage and thermography inspection — written for contractors, consultants and QA/QC engineers in Saudi Arabia.
Half the time lost on an inspection day is spent looking for drawings, keys and the person who knows which…
A facility manager in Riyadh recently discovered his server room would have failed a real fire event — not because…
A damp patch is the last thing a leak produces, not the first. Here is how acoustic, thermal, moisture and…
One shows you where the air goes; the other tells you how much. Most projects need both — here is…
Why the envelope of a data hall or clean room is tested with a blower door, what the air permeability…
Leakage classes, test pressures, how much ductwork to test and what the numbers mean — a commissioning engineer’s guide to…
Loose terminations, overloaded phases and failing breakers all get hot before they fail. A Level II infrared survey finds them…
Spot readings, gauge readings, area averages and the five levels of tolerance — how to read a DFT report to…
Sprayed and intumescent fireproofing is judged on thickness, density and adhesion — numbers the installer has every reason to round…
A practical checklist for firestop inspections on Saudi projects — penetrations, joints, documentation and the details that fail at the…
Scope review, site inspection, findings recorded with photographs and measurements, report issued for Civil Defence and consultant approval.